Xuan Loc Industrial Park (IP-109)

  • $70
Xuan Tam Commune, Xuan Loc Ward, Dong Nai Province, Dong Nai
For Sale New
Xuan Tam Commune, Xuan Loc Ward, Dong Nai Province, Dong Nai
  • $70

Overview

  • Industrial Park
  • Property Type
  • 108
  • ha
  • 33
  • Lease Term Remaining

Details

Updated on November 13, 2023 at 10:29 am
  • Property ID: IP-109
  • Price: $70
  • Property Size: 108 ha
  • Year Built: 2006
  • Property Type: Industrial Park
  • Property Status: For Sale
  • Lease Term Remaining: 33
  • Address Xuan Tam Commune, Xuan Loc Ward, Dong Nai Province
  • City Dong Nai

Description

Description

Established in 2005 in Xuân Lộc district, Đồng Nai province, Xuân Lộc Industrial Zone benefits significantly from its strategic location. Situated adjacent to National Highway 1, a vital North-South transportation artery in Vietnam, it enjoys proximity to key transportation hubs, such as the Gia Ray railway station, the Ho Chi Minh City – Dầu Giây – Long Thành expressway, and Phú Mỹ Port.

Attractive Investment Sectors:

  • Textiles (excluding dyeing)
  • Garments
  • Footwear
  • Electronics
  • Plastic products
  • Packaging
  • High-end wooden furniture
  • Processing of agricultural and forestry products
  • Agrochemicals
  • Pharmaceuticals
  • High-quality construction materials
  • Medical equipment
  • Sports equipment
  • Educational equipment.

Investment Highlights

Location 

Xuân Lộc Industrial Zone is situated adjacent to National Highway 1, a critical North-South transportation route, in close proximity to the Ho Chi Minh City – Dầu Giây – Long Thành expressway and Phú Mỹ Port.

  • Distance to Long Khánh town: 20 km
  • Distance to Ho Chi Minh City – Long Thành – Dầu Giây expressway: 35 km
  • Distance to Biên Hòa city: 90 km
  • Distance to Ho Chi Minh City: 110 km
  • Distance to Phú Mỹ Port: 70 km
  • Distance to Gò Dầu Port: 73 km
  • Distance to Cái Mep Port: 98 km
  • Distance to Cát Lái Port: 108 km
  • Distance to Tân Sơn Nhất Airport: 114 km
  • Distance to Long Thành Airport: 77 km

Infrastruture 

  • Transportation System:
    • Main Road System: Located on the main axis of National Highway 1, a crucial North-South transportation artery.
    • Internal Road Network: Designed to accommodate vehicle loads ranging from H18 to H30.
    • Road Surface Structure: Asphalt concrete.
    • Roadway Width: Ranging from 7.5 to 17 meters, with two lanes on the main road.
    • Sidewalks: 8 to 12 meters wide.
  • Drainage System: Stormwater and wastewater drainage infrastructure is situated along both sides of the road.
  • Water Supply: Provided by Đồng Nai Water Supply Company.
  • Electricity Supply: Electricity is sourced from the national grid through a 50 MVA power line and a 22kV grid.
  • Telecommunication Infrastructure: A technology corridor is established to facilitate telecommunications.
  • Wastewater Treatment: Treatment Capacity: 1,000 m³ per day/night, utilizing a combination of biological and chemical treatment methods. Complies with the QCVN 40:2011/BTNMT (Column A) standards.

Schedule a Tour

Tour Type

Contact Information

View Listings

Enquire About This Property

0 Review

Sort by:
Leave a Review

Leave a Review

Similar Listings

Compare listings

Compare
Vy Le
  • Vy Le