Description
Established in 2005 in Xuân Lộc district, Đồng Nai province, Xuân Lộc Industrial Zone benefits significantly from its strategic location. Situated adjacent to National Highway 1, a vital North-South transportation artery in Vietnam, it enjoys proximity to key transportation hubs, such as the Gia Ray railway station, the Ho Chi Minh City – Dầu Giây – Long Thành expressway, and Phú Mỹ Port.
Attractive Investment Sectors:
- Textiles (excluding dyeing)
- Garments
- Footwear
- Electronics
- Plastic products
- Packaging
- High-end wooden furniture
- Processing of agricultural and forestry products
- Agrochemicals
- Pharmaceuticals
- High-quality construction materials
- Medical equipment
- Sports equipment
- Educational equipment.
Investment Highlights
Location
Xuân Lộc Industrial Zone is situated adjacent to National Highway 1, a critical North-South transportation route, in close proximity to the Ho Chi Minh City – Dầu Giây – Long Thành expressway and Phú Mỹ Port.
- Distance to Long Khánh town: 20 km
- Distance to Ho Chi Minh City – Long Thành – Dầu Giây expressway: 35 km
- Distance to Biên Hòa city: 90 km
- Distance to Ho Chi Minh City: 110 km
- Distance to Phú Mỹ Port: 70 km
- Distance to Gò Dầu Port: 73 km
- Distance to Cái Mep Port: 98 km
- Distance to Cát Lái Port: 108 km
- Distance to Tân Sơn Nhất Airport: 114 km
- Distance to Long Thành Airport: 77 km
Infrastruture
- Transportation System:
- Main Road System: Located on the main axis of National Highway 1, a crucial North-South transportation artery.
- Internal Road Network: Designed to accommodate vehicle loads ranging from H18 to H30.
- Road Surface Structure: Asphalt concrete.
- Roadway Width: Ranging from 7.5 to 17 meters, with two lanes on the main road.
- Sidewalks: 8 to 12 meters wide.
- Drainage System: Stormwater and wastewater drainage infrastructure is situated along both sides of the road.
- Water Supply: Provided by Đồng Nai Water Supply Company.
- Electricity Supply: Electricity is sourced from the national grid through a 50 MVA power line and a 22kV grid.
- Telecommunication Infrastructure: A technology corridor is established to facilitate telecommunications.
- Wastewater Treatment: Treatment Capacity: 1,000 m³ per day/night, utilizing a combination of biological and chemical treatment methods. Complies with the QCVN 40:2011/BTNMT (Column A) standards.