Cau Cang Industrial Zone in Long An is a modern, green-focused project in a key South economic area. It spans 128.8 hectares, with 92.4 hectares for lease, 39 for workshops, and 6 for warehouses. Featuring 4 central lanes and 2 auxiliary lanes, the internal road system is complemented by 280,000 sqm of industrial workshops powered by a 32MW solar system.
The under-construction Cau Cang port cluster is equipped for 20,000-ton cargo ships, connecting to major Southern ports. IMG Phuoc Dong Port serves the Western economic region and integrates into Vietnam’s inland waterway system.
Investment Highlights
Location
Cau Cang Industrial Park and IMG Phuoc Dong Port are situated in the key economic area in the south, benefiting from abundant labor resources from neighboring provinces and Ho Chi Minh City. This makes IMG Phuoc Dong Port an appealing force for future investors.
Convenient transportation
- Cau Cang IMG Phuoc Dong Industrial Park – District 1: 🕒 1 hour and 20 minutes
- Cau Cang IMG Phuoc Dong Industrial Park – Long An International Port: 🕒 30 minutes
- Cau Cang IMG Phuoc Dong Industrial Park – Cat Lai Port: 🕒 1 hour and 30 minutes
- Cau Cang IMG Phuoc Dong Industrial Park – Cai Mep Port: 🕒 2 hours and 30 minutes
- Cau Cang IMG Phuoc Dong Industrial Park – Tan Son Nhat Airport: 🕒 1 hour and 35 minutes
- Cau Cang IMG Phuoc Dong Industrial Park – Tan An City: 🕒 1 hour and 5 minutes
- Cau Cang IMG Phuoc Dong Industrial Park – Ho Chi Minh City: 🕒 1 hour
Distances to neighboring areas
- Distance to Ben Thanh Market: 📍 36 km
- Distance to Cat Lai Port: 📍 48 km
- Distance to Phu My Hung: 📍 44 km
- Distance to Long An International Port: 📍 20 km
- Distance to Cai Mep Port: 📍 63 km
Infrastructure
- Transportation:
- 🛣️ Main road: 4 central lanes, 22 meters wide
- 🚗 Internal roads: 11 – 14 meters, hot asphalt concrete surface, designed to Vietnamese standards.
- Electricity Supply:
- ⚡ Power source: 110/22KV – (16 plus 40) MVA
- 💡 Capacity: 63MW
- Clean Water Supply:
- 💧 Capacity: 5,000m³/day and night
- 🚰 Water source: Can Duoc Water Plant
- 🚿 Pipeline: F = 110 mm – 315 mm
- Wastewater Treatment:
- 🌊 Plant capacity: 3,000m³/day and night
- 🏭 Internal treatment: Meets column B standards
- 🌐 Park treatment: Meets column A standards (QCVN 40:2011/BTNMT) before discharge into Vam Co River.
- Telecommunications System: 📞 Connected to district’s telecommunications network
- Firefighting System: 🚒 Pillars: Spaced 150 meters apart, 🚰 F = 110m
Other facilities
On-site facilities: Customs, Post Office, Medical Station, Cafeteria, Convenience Store… all within the Industrial Park.
Off-site facilities:
- Schools: 5 km from the Industrial Park General
- Hospital: 5 km from the Industrial Park
- District and Provincial Administrative Center: From 4 to 6 km
- Industrial Park Banks: 4 km
Cau Cang IMG Phuoc Dong Industrial Park will be an ideal place for investment and business development in the near future, especially for businesses seeking a modern and environmentally friendly working environment.