In Ben Cat Town, Binh Duong Province, adjacent to Mỹ Phước – Tân Vạn Expressway and HCMC Ring Road 4.
Distance to District 1: 38km; Tan Son Nhat International Airport: 40km.
5km from New Binh Duong City; 3km from Dai Nam Tourist Area; 2km from Mỹ Phước General Hospital.
Nearby international universities: Viet Duc (100m) and Eastern International University (4.5km).
Infrastructure
Internal roads: 25m wide with 15m asphalt surface and 5m-side lanes (40-60 ton/truck load capacity).
Electricity: Supplied from Tan Dinh–Mỹ Phước and Ben Cat–Mỹ Phước lines (22KV) with capacities of 126 MVA (Phase 1), 200 MVA (Phase 2), and 500 MVA (Phase 3).
Water: Treated to WHO standards, capacities increasing from 12,000m3/day (Phase I) to 120,000m3/day (Phase III).
Telecommunications: Pre-installed phone lines and unlimited fiber optic connections for various applications.